Case Study P/01

103 Colmore Row

103 Colmore Row is Birmingham's tallest office building — a 25-storey Grade A development where the controls package had to serve both landlord plant and a highly flexible tenant fit-out strategy.

Storeys
25
Sector
Commercial
Location
Birmingham
Scope
Install · Integrate · Commission

The challenge

A tall, mixed-tenancy office requires a control system that can be sub-divided as floors are let, without re-engineering the landlord systems each time. Access and logistics on a city-centre tower also placed a premium on accurate coordination before installation.

Our approach

Robell delivered the installation, integration and commissioning of the Building Management System, working alongside the M&E contractor to sequence panel installation and field wiring floor by floor as the building topped out.

The outcome

The building was handed over with a fully verified control system, complete point records and a head-end that gives the landlord clear visibility of plant performance across every floor.

Scope of works

BMS installation, integration and commissioning

Commercial Office · Birmingham